Showbiz Shelly

Showbiz Shelly

Listen to Showbiz Shelly on 103.5 KISS FM Monday through Friday from 10AM-Noon + Catch the Showbiz Shelly Show Down at 7:45AM on The Fred Show! Full Bio

 

Phase Two of Kennedy Expressway Construction Project Starts Monday Night

Phase two the Kennedy construction project begins tonight!

Your drive on the Kennedy Expressway will likely take longer -- starting soon.

Phase 2 of the Illinois Department of Transportation's massive Kennedy expressway rehabilitation project is slated to begin Monday night, officials said. According to IDOT, Phase 2 of the project will close the reversible express lanes in both directions for approximately eight months.

Those closures will begin Monday at 9 p.m., and are expected to continue through the fall, IDOT said.

The left lane on the inbound Kennedy and Edens will also be closed during that time, starting at the Kennedy/Edens junction and continuing to the entrance to the reversible lanes at Montrose Avenue, IDOT said.

Finally, bridge cleaning, painting and light installation will begin at Hubbard’s Cave, requiring closures of the left lane in the inbound Kennedy from Chicago Avenue to Lake Street and on the outbound Kennedy from the Byrne Interchange to Grand Avenue.

More details are below!


Sponsored Content

Sponsored Content